|
|
|
Our company is blessed with a team of highly knowledgeable, qualified and experienced team of professionals, who work relentlessly towards its aim
of making clients completely satisfied.
|
|
|
|
HOME |
PROFILE |
SERVICES |
PROJECTS EXECUTED |
TEAM |
CONTACT |
|
|
|
KEY EXPERTS |
S & S team is made up of a
number of like-minded experts dedicated to providing excellence in power projects to their clients.
Key experts are specialists in their particular field and collectively provide many years of
experience of major power projects. These experts are briefly described below. In addition to our
key experts, S & S has a number of additional specialists who are available to join our team as and
when required in order to provide a complete and comprehensive service in all key areas
|
|
|
DESIGN & ENGINEERING |
Over 35 years of experience in Premier
Power Sector organisation like Central Electricity Authority, Steage Energy Services (India) and
WAPCOS, in design and Engineering of Power Plant and planning of Power Sector for the country. The
experience in Power Sector is not limited to design and engineering but is also enriched with operation
and maintenance of 834MW gas based Power Plant of NTPC and carrying out construction activities for
renovation and modernisation of Hwange Thermal Power Station(920MW) in Zimbabwe. Renovation &
Modernisation &R&M) of various units of 110 MW and 210MW was carried out and the feasibility
studies for the R&M activities and cost estimates for the same were prepared. Extensive experience
in detailed engineering of over 20 Power plants including green field plants of large capacity and
small capacity .Carry out basic design concept study of the project and prepare basic design philopy in
the form of Design Memoranda and plant layout for various such systems in the Power Plant and
preparation of detailed specification of the various systems. Detailed design and Engineering for the
project and vetting of the vendor drawing for approval. Scruting and evaluation of the Technical and
financial offers for the Power Plant. Project co-ordination and contract management Project Monitoring.
I was also involved in preparation of feasibility reports for various power station and also appraisal
of the power station for examining the techno economic feasibility of the proposals. Over six years
experience in Power sector planning for the country and carried out generation planning for the XI five
year plan. Prepared electric load forecast known as the 17th Electric power survey for long term demand
ranging from 5 years to 15 years. Prepared first ever co2 data base line for the India Power sector
which was first in the world. Leadership role for improving the efficiency of the India Power Sector
through mapping of over 50 various generating unit and creating enabling infrastructure and efficiency
group in various Power Stations.
Some of the Major Projects
Handled:
-
Design and Engineering of (2X800 MW)
supercritical Yermarus TPP of KPCL
-
Design and Engineering of (3X210 MW , 2X500
MW) Anpara A and B power Plants
-
Design and Engineering of 6X30MW Kathalguri
Gas Based Power plant.
-
Design and Engineering of Godavari Lift
irrigation mega scheme incorporating vary large pumps of 7 cusec (25200 cubic meter per hour) at
5 different pumping station covering a distance of over 200km.
-
Design and engineering of Kota Lift
irrigation scheme for feeding the canal.
-
Preparation of Rural Electrification Scheme
with End use infrastructure for entire Zimbabwe covering large irrigation schemes, medium and
small farm irrigation having over 6000 pumps.
Worked as Members of Expert Committee
on Environment for clearance of various aspects of Power sector like energy efficiency. Power demand
Projects, new technologies in various International and national level seminars.
|
|
OPERATION & MAINTENANCE |
More than 38 years’ professional
experience in planning, design,Erection, Operation and Maintenance of Thermal Power Projects and Power
Systems for evacuation of power. Fuel Supply agreement, Power Purchase agreement. Coordination of
Southern African Power Fuel for Zimbabwe. Standardisation of 200 MW Thermal Units, Commission of first
set of 200 MW unit in India Station Manager/ Head of 920 MW Thermal Power Station in Zimbabwe.
Feasibility studies and Bankable Detailed Project Report including Tender Documents on EPC basis for
Expansion of Hwange Thermal Power Station in Zimbabwe (2x300 MW). Bankable Project Report and Execution
of Hydro Projects. Bankable Project Report and Execution of Transmission and Distribution System.
Bankable Project Report and Implementation of Integrated Rural Electrification Project in Africa
combined with end use infrastructure e.g. pumps irrigation and agriculture development. Team Leader for
Owners Agreement to supervise the construction of Thermal Power Station in Zimbabwe and peat power
project in Pwanda.
Various Projects Handled
:
-
Team leader for operation & Maintenance support for Hwange
Power Station Zimbabwe including skill development programme and off site training for Zimbabian
Engineers and operators.
-
Repowering of small Thermals by replacing old chain grate Boilers
and refurbishment of Turbine, Generate and balance of plants for Harare II, Bulway and Munyati in
Zimbabwe. Life execution studies for turbine and generator. Geotechnical Divestigatio for Geirez
Hydro power project in Zimbabwe.
-
Project Report for Deka Pumping station and Rever Dtake System for
water supply to Hwange Power Station in Zimbabwe.
-
Project Management services and Owners Engineer for Peat Power
Project in Rwanda.
-
Project Management for Solar lighting Project in Seiraleon
Africa.
-
Overhauling and renovation of stage-1 Bolier and Turbine for
4X100MW Zimbabwe.
-
Project management Services, construction supervision and quality
control for 4X5MW gas turbine for DLF in Gurgaon.
-
Bankable feasibility Report for expansion of Hwange Thermal
Project (2X300MW) and Kariba Hydro Power Station (2X150MW) in Zimbabwe.
-
Expanded Rural Electrification Project including end use
Infrastructure and strengthening of medium voltage Transmission System in Zimbabwe.
-
Feasibility studies for 2x250MW Thermal Project in South Africa.
Bankable Project report for Ultra Megha Projects in Andhra Pradesh (4000 MW) and 1500 MW in MP in
India.
|
|
PROJECT PLANNING & POLICY |
40 Years of Professional Experience
in the various fields of Power Sector Administration & Management, Electricity Regulation,
Generation, Transmission & Distribution, Design & Engineering of Thermal & Hydro Power
Stations, Energy Efficiency, Grid Operation, Training, Human Resource Management, Electricity
Policy & Plans and CEA Regulations, Techno-Economics, optimization studies etc. 15 Years at
very senior level in CERC, Ministry of Power, CEA in the rank of Secretary and Addl. Secretary to
Govt. of India including 5 years at Chief Engineer equivalent to Joint Secretary in the Govt. 4
years Dealing mainly with Tariff regulations of bulk supply from Central Govt. owned/ interstate
generation and transmission companies, Interstate transmission and Grid Code, Market Development for
short term electricity, licensing, adjudicating and advice to Govt., balancing consumer interest and
investment promotion, Electricity Market oversight and dealing with Grid security, improving
availability and efficiency of generating stations & Management of Power Sector. 6 years CEA
Management. 3 Years (Management and Administration) Head of Bureau of Energy Efficiency (BEE). 5
years, Member of Eastern Regional Electricity Board and was responsible for the coordinated grid
operation to maintain the quality of electricity in the Eastern Region of the Country in the year
1997-98 and dealt with Optimization of Generation and transmission capacities, inter-state and
inter-regional exchange of energy, generation scheduling and accounting etc. The Working Group on
National Action Plan for Climate Change under the National Mission of Enhanced Energy Efficiency,'
Task Force of formulation of the action plan for development of energy sector in the North Eastern
Region, Expert Committee appointed by MNRE to study the geo-thermal based power generating potential
in the Puga geo-thermal fields of Ladakh, J&K, Working Group of research and development of
energy sector for 11th plan, were set up under his chairmanship. He played a lead role in 50,000MW of
hydro power initiative announced by Hon'ble Prime Minister. Credit of Publication of CO2 Baseline
data in the Indian power sector first time in the World goes to him. Mapping of thermal power
stations in the country for optimizing the efficiency of operation were spearheaded by him. He has
travelled extensively overseas making professional/official visits to USA, Canada,
Europe, UK, Poland, Belgium, Germany, USSR, Asia Vietnam, Africa Kenya, Guyana and
Nigeria. To his credit he has more than 50 technical papers published and presented in the national
and international forums. He has also been on Governing Council/Board of Directors of various
institutions like CPRI, NPTI, CWet, DVC etc. Received Life Time Achievement Award from CBIP and from
Rajiv Gandhi Technical University, Bhopal.
|
|
PROJECT MAINTENANCE |
38 years of experience in field of skill
department, training of operation and maintenance personnel, organisation simulation training, training
of Senior Management personnel and organised all training programmes as specialist trainer in Zimbabwe.
Mechanical Engineer and trained in CEGB UK and South Korea. Group leader and adviser to General Manager
for providing operation and maintenance support for HWANGE Power Station, Zimbabwe. Preparation and
exestuation of station business plan, strategic plan, skill upgrade plan, performance plan for short
term, medium term and long term with key indicator for all management employee. Implementation of
Maintenance Management System (MMS) Procurement system (IPMS) Operation procedure and guide lines
Condition Monitoring, Risk and safety analysis, Assistance in preparing of technical specifications of
various equipments in large Thermal Power Station Updating of O&M manual in Thermal Power Station,
arranged onsite and offsite training of Post Graduate engineers at induction level Worked as Chief
General Manager of a large Thermal Power Station at MSEB. (Karadi and chandrapur)
|
|
|
|
|
|
|
|
|
|
|
|
|